Glossary: UVEOS, ASN, GAIS, EGTS and other terms
Short definitions of the terms found in documentation, contracts and ERA-GLONASS equipment requirements.
UVEOS BOTHERTZ-24 · ASN BOTHERTZ-24
What is checked in UVEOS acoustic tests, how the test is performed in the vehicle and why the 1–5 day timeframe matters for an assembly line.
The UVEOS must provide two-way voice communication with the emergency services operator. This cannot be verified on the bench: what matters is how the device is heard and how it hears in a real vehicle — with engine noise, vibration and the specifics of the cabin.
Acoustic tests confirm that communication works in a specific vehicle.
The tests are carried out on the vehicle or in conditions that simulate the cabin.
For an assembly line the timelines are critical: a production delay costs more than the equipment itself. That is why tests are scheduled before the series launch.
If you are launching a new model, put the tests in the schedule before production starts — it is cheaper than stopping the assembly line.
Reviewed: 17.11.2026
Read next
Short definitions of the terms found in documentation, contracts and ERA-GLONASS equipment requirements.
UVEOS BOTHERTZ-24 · ASN BOTHERTZ-24
What a dangerous goods carrier needs to configure: ASN, transmission to GAIS, documents and typical mistakes when equipping a fleet.
ASN BOTHERTZ-24
How to bring fuel control, mileage and CAN errors into one stream: wiring diagram, configuration and what to check in reports.
ASN BOTHERTZ-24
Next step
Describe your task and we will prepare a quote with the model, activation cost and delivery timeline. We reply within one business day.